The 2006 Construction Season is underway. The 2006 Construction Program runs from July 1, 2005 to June 30, 2006. Listed below are the projects completed and those still pending for the 2006 Construction Program.
2006 PROJECTS (Just use the links below to view photos of each project if available)
L-14-34-1 Dreyer Pipe NW Corner Section 34 T68N R40W. This project involved replacing an existing bridge destroyed by an overweight vehicle with 2 large diameter pipe on a Level "B" road. The work was done by county crews and the cost was $40,000. This project was paid out of Local funds.
FM-CO36(40)--55-36 County Wide HMA Crack Filling This project involves pavement crack cleaning and sealing. The contract price for this project was $56,333. This project will be paid out of the Farm to Market fund.
FM-CO36(38)--55-36 Aistrope RCB Section 1 T70N R42W. This project involves replacing an existing greenwood structure with a reinforcecd concrete box with a flume outlet. The contract price for this project was $113,416. This project will be paid out of the Farm to Market fund.
FM-CO36(39)--55-36 Warren RCB Section 13 T67N R42W. This project involves replacing an existing greenwood structure with a reinforcecd concrete box with a flume outlet. The contract price for this project was $183,357. This project will be paid out of the Farm to Market fund.
L-17-36-3 Prater RCB S. Line Section 25- T67N R42W. This project involves replacing an existing greenwood structure with a reinforced concrete box with a flume outlet. This project will be let on October 27th. This project will be paid out of Local funds.
L-3-23-2 Dinville RCB W. Line of Section 23 T70N R41W. This project involves replacing an existing greenwood structure with a reinforced concrete box with a flume outlet. This project will be paid out of Local funds.
![]()